{"id":14069,"date":"2024-06-28T14:50:51","date_gmt":"2024-06-28T14:50:51","guid":{"rendered":"https:\/\/www.aroraengineers.com\/?p=14069"},"modified":"2024-08-21T17:17:53","modified_gmt":"2024-08-21T17:17:53","slug":"hartsfield-jackson-atlanta-international-airport-concourse-d-widening","status":"publish","type":"post","link":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/","title":{"rendered":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening"},"content":{"rendered":"<p>Arora Engineers (Arora) was recently featured in an article by Airport Improvement entitled \u201cAtlanta Int\u2019l Combines Modular and Traditional Build Methods for Concourse D Expansion.\u201d Hartsfield-Jackson Atlanta International Airport (ATL), serving over 100 million passengers annually, is a vital component of the global aviation network. Minimizing operational disruptions is critical to all airport renovations and expansions. Concourse D, over 40 years old and the narrowest concourse at ATL, was identified for improvements to meet current and future demands. Arora Engineers (Arora) provided the City of Atlanta Department of Aviation professional Airside Electrical, Security, and ICT services. Our team was proud to work in collaboration with the Civil, MEP, IT, Architectural, and Structural teams at the Hartsfield-Jackson Atlanta International Airport, home to the largest single airline hubbing operation in the world. Specifically, Arora provided services widening Concourse D and 39 gate locations.<\/p>\n<p>The current expansion, set to finish by 2029, aims to double holdroom size, widen the main corridor, increase ceiling heights, increase restroom sizes, and add new building systems. These changes will enhance the space with more ambient light through additional glass. The updated concourse will have 34 aircraft positions, exclusively for Group III aircraft, improving overall capacity despite reducing the total number of gates. The project, estimated to cost $1.4 billion, is driven by innovation and creativity to significantly improve the passenger experience by providing more space and accessible facilities.<\/p>\n<p>For further insights, read the full article by <a href=\"https:\/\/indd.adobe.com\/view\/41e704d7-185c-4542-b00e-a58774f9f396\">clicking here<\/a>.<\/p>\n<p>Images \u00a9 Corgan<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Arora Engineers (Arora) was recently featured in an article by Airport Improvement entitled \u201cAtlanta Int\u2019l Combines Modular and Traditional Build Methods for Concourse D Expansion.\u201d Hartsfield-Jackson Atlanta International Airport (ATL), serving over 100 million passengers annually, is a vital component of the global aviation network. Minimizing operational disruptions is critical to all airport renovations and [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[68],"class_list":["post-14069","post","type-post","status-publish","format-standard","hentry","category-news","tag-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hartsfield-Jackson Atlanta International Airport Concourse D Widening - Arora Engineers<\/title>\n<meta name=\"description\" content=\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening\" \/>\n<meta property=\"og:description\" content=\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\" \/>\n<meta property=\"og:site_name\" content=\"Arora Engineers\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-28T14:50:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-21T17:17:53+00:00\" \/>\n<meta name=\"author\" content=\"Anne Keener\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Keener\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\"},\"author\":{\"name\":\"Anne Keener\",\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea\"},\"headline\":\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening\",\"datePublished\":\"2024-06-28T14:50:51+00:00\",\"dateModified\":\"2024-08-21T17:17:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\"},\"wordCount\":245,\"keywords\":[\"News\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\",\"url\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\",\"name\":\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening - Arora Engineers\",\"isPartOf\":{\"@id\":\"http:\/\/www.aroraengineers.com\/#website\"},\"datePublished\":\"2024-06-28T14:50:51+00:00\",\"dateModified\":\"2024-08-21T17:17:53+00:00\",\"author\":{\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea\"},\"description\":\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening\",\"breadcrumb\":{\"@id\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\/\/www.aroraengineers.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hartsfield-Jackson Atlanta International Airport Concourse D Widening\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/www.aroraengineers.com\/#website\",\"url\":\"http:\/\/www.aroraengineers.com\/\",\"name\":\"Arora Engineers\",\"description\":\"Infrastructure engineering solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/www.aroraengineers.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea\",\"name\":\"Anne Keener\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g\",\"caption\":\"Anne Keener\"},\"url\":\"https:\/\/www.aroraengineers.com\/author\/anne-keener\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening - Arora Engineers","description":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/","og_locale":"en_US","og_type":"article","og_title":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening","og_description":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening","og_url":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/","og_site_name":"Arora Engineers","article_published_time":"2024-06-28T14:50:51+00:00","article_modified_time":"2024-08-21T17:17:53+00:00","author":"Anne Keener","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Keener","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/#article","isPartOf":{"@id":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/"},"author":{"name":"Anne Keener","@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea"},"headline":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening","datePublished":"2024-06-28T14:50:51+00:00","dateModified":"2024-08-21T17:17:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/"},"wordCount":245,"keywords":["News"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/","url":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/","name":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening - Arora Engineers","isPartOf":{"@id":"http:\/\/www.aroraengineers.com\/#website"},"datePublished":"2024-06-28T14:50:51+00:00","dateModified":"2024-08-21T17:17:53+00:00","author":{"@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea"},"description":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening","breadcrumb":{"@id":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.aroraengineers.com\/hartsfield-jackson-atlanta-international-airport-concourse-d-widening\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/www.aroraengineers.com\/"},{"@type":"ListItem","position":2,"name":"Hartsfield-Jackson Atlanta International Airport Concourse D Widening"}]},{"@type":"WebSite","@id":"http:\/\/www.aroraengineers.com\/#website","url":"http:\/\/www.aroraengineers.com\/","name":"Arora Engineers","description":"Infrastructure engineering solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/www.aroraengineers.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea","name":"Anne Keener","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g","caption":"Anne Keener"},"url":"https:\/\/www.aroraengineers.com\/author\/anne-keener\/"}]}},"_links":{"self":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts\/14069","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/comments?post=14069"}],"version-history":[{"count":4,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts\/14069\/revisions"}],"predecessor-version":[{"id":14082,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts\/14069\/revisions\/14082"}],"wp:attachment":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/media?parent=14069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/categories?post=14069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/tags?post=14069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}