{"id":10846,"date":"2022-04-11T15:28:18","date_gmt":"2022-04-11T15:28:18","guid":{"rendered":"https:\/\/www.aroraengineers.com\/?p=10846"},"modified":"2025-04-30T19:24:38","modified_gmt":"2025-04-30T19:24:38","slug":"steel-framing-in-progress-at-lehigh-valley-international-airport","status":"publish","type":"post","link":"https:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/","title":{"rendered":"Steel Framing In Progress at Lehigh Valley International Airport"},"content":{"rendered":"<p>Steel framing is currently in progress for the <a href=\"https:\/\/www.flyabe.com\/\" target=\"_blank\" rel=\"noopener\">Lehigh Valley International Airport (ABE)<\/a> Terminal Connector\/ TSA Checkpoint project. The new Terminal Connector \/ TSA Security Expansion will change the entire travel experience for passengers with up to four lanes of TSA Security Screening and a more direct connection to the Departure Terminal that will be accessible from the ticket counter level.<\/p>\n<p>Arora was recently featured in an article entitled, <a href=\"https:\/\/thebrownandwhite.com\/2022\/03\/28\/lehigh-valley-airport-expands-in-the-flight-direction\/\" target=\"_blank\" rel=\"noopener\">&#8220;A Move in the \u2018Flight\u2019 Direction: Lehigh Valley Airport is Expanding.&#8221;<\/a> The article features Arora and our work as the prime consultant on this project. Thomas Cook, Project Construction Manager, says that in his 14 years of experience at Arora, this is one of the biggest projects he has undertaken. Cook\u2019s role is to ensure the project is delivered on time and within budget and manage all required inspections. He goes on to say, \u201cThe airport has done a tremendous job, and I have to give the contractors a lot of credit, as we\u2019ve worked to bring the project together so we can deliver exactly what we agreed to almost two years ago and make it an exciting opening for the airport.&#8221;<\/p>\n<p>The overall goal of this project is to improve the Level of Service for both the Departing and Arriving Passengers at ABE. While the project is still in the early stages, it is set to finish in 2023.<\/p>\n<p>To learn more about Arora&#8217;s scope of work on this project, <a href=\"https:\/\/www.aroraengineers.com\/project\/lnaa-abe-security-checkpoint-connector-improvements\/\" target=\"_blank\" rel=\"noopener\">click here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal Connector \/ TSA Security Expansion will change the entire travel experience for passengers with up to four lanes of TSA Security Screening and a more direct connection to the Departure Terminal that will be [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,39],"tags":[115,89],"class_list":["post-10846","post","type-post","status-publish","format-standard","hentry","category-news","category-insight","tag-blog","tag-insight"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Steel Framing In Progress at Lehigh Valley International Airport - Arora Engineers<\/title>\n<meta name=\"description\" content=\"Steel Framing In Progress at Lehigh Valley International Airport \u2013 Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal | Arora Engineers\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steel Framing In Progress at Lehigh Valley International Airport\" \/>\n<meta property=\"og:description\" content=\"Steel Framing In Progress at Lehigh Valley International Airport \u2013 Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal | Arora Engineers\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\" \/>\n<meta property=\"og:site_name\" content=\"Arora Engineers\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-11T15:28:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-30T19:24:38+00:00\" \/>\n<meta name=\"author\" content=\"Anne Keener\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Anne Keener\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/#article\",\"isPartOf\":{\"@id\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\"},\"author\":{\"name\":\"Anne Keener\",\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea\"},\"headline\":\"Steel Framing In Progress at Lehigh Valley International Airport\",\"datePublished\":\"2022-04-11T15:28:18+00:00\",\"dateModified\":\"2025-04-30T19:24:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\"},\"wordCount\":251,\"keywords\":[\"Blog\",\"Insight\"],\"articleSection\":[\"News\",\"Insight\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\",\"url\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\",\"name\":\"Steel Framing In Progress at Lehigh Valley International Airport - Arora Engineers\",\"isPartOf\":{\"@id\":\"http:\/\/www.aroraengineers.com\/#website\"},\"datePublished\":\"2022-04-11T15:28:18+00:00\",\"dateModified\":\"2025-04-30T19:24:38+00:00\",\"author\":{\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea\"},\"description\":\"Steel Framing In Progress at Lehigh Valley International Airport \u2013 Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal | Arora Engineers\",\"breadcrumb\":{\"@id\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\/\/www.aroraengineers.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Steel Framing In Progress at Lehigh Valley International Airport\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/www.aroraengineers.com\/#website\",\"url\":\"http:\/\/www.aroraengineers.com\/\",\"name\":\"Arora Engineers\",\"description\":\"Infrastructure engineering solutions\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/www.aroraengineers.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea\",\"name\":\"Anne Keener\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/www.aroraengineers.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g\",\"caption\":\"Anne Keener\"},\"url\":\"https:\/\/www.aroraengineers.com\/author\/anne-keener\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Steel Framing In Progress at Lehigh Valley International Airport - Arora Engineers","description":"Steel Framing In Progress at Lehigh Valley International Airport \u2013 Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal | Arora Engineers","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/","og_locale":"en_US","og_type":"article","og_title":"Steel Framing In Progress at Lehigh Valley International Airport","og_description":"Steel Framing In Progress at Lehigh Valley International Airport \u2013 Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal | Arora Engineers","og_url":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/","og_site_name":"Arora Engineers","article_published_time":"2022-04-11T15:28:18+00:00","article_modified_time":"2025-04-30T19:24:38+00:00","author":"Anne Keener","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Anne Keener","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/#article","isPartOf":{"@id":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/"},"author":{"name":"Anne Keener","@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea"},"headline":"Steel Framing In Progress at Lehigh Valley International Airport","datePublished":"2022-04-11T15:28:18+00:00","dateModified":"2025-04-30T19:24:38+00:00","mainEntityOfPage":{"@id":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/"},"wordCount":251,"keywords":["Blog","Insight"],"articleSection":["News","Insight"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/","url":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/","name":"Steel Framing In Progress at Lehigh Valley International Airport - Arora Engineers","isPartOf":{"@id":"http:\/\/www.aroraengineers.com\/#website"},"datePublished":"2022-04-11T15:28:18+00:00","dateModified":"2025-04-30T19:24:38+00:00","author":{"@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea"},"description":"Steel Framing In Progress at Lehigh Valley International Airport \u2013 Steel framing is currently in progress for the Lehigh Valley International Airport (ABE) Terminal Connector\/ TSA Checkpoint project. The new Terminal | Arora Engineers","breadcrumb":{"@id":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/"]}]},{"@type":"BreadcrumbList","@id":"http:\/\/www.aroraengineers.com\/steel-framing-in-progress-at-lehigh-valley-international-airport\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/www.aroraengineers.com\/"},{"@type":"ListItem","position":2,"name":"Steel Framing In Progress at Lehigh Valley International Airport"}]},{"@type":"WebSite","@id":"http:\/\/www.aroraengineers.com\/#website","url":"http:\/\/www.aroraengineers.com\/","name":"Arora Engineers","description":"Infrastructure engineering solutions","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/www.aroraengineers.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/2e4ad0f6f4994dea6492ce8406a50eea","name":"Anne Keener","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/www.aroraengineers.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ee5326df1d399f1e6b25712a53f2f10b1a279199fa959249db0182855c9c35ad?s=96&d=mm&r=g","caption":"Anne Keener"},"url":"https:\/\/www.aroraengineers.com\/author\/anne-keener\/"}]}},"_links":{"self":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts\/10846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/comments?post=10846"}],"version-history":[{"count":2,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts\/10846\/revisions"}],"predecessor-version":[{"id":10854,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/posts\/10846\/revisions\/10854"}],"wp:attachment":[{"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/media?parent=10846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/categories?post=10846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aroraengineers.com\/wp-json\/wp\/v2\/tags?post=10846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}